Free tier: 50 queries/day • No signup • Works on any phone
legis-link-mcp-production-3e9b.up.railway.app/app
U
Wire size for 45A load, 30 metres, 240V single phase NSW
LL
10mm² copper conductor required. Working: 45A continuous load at 30m on 240V single phase gives 1.97% voltage drop — within the 3% sub-circuit limit. Installation method (clipped direct, in conduit) may require derating to 16mm² if bundled.
Generate a RAMS for electrical switchboard installation
LL
RAMS — Electrical Switchboard Installation NSW
Hazard Register: Electric shock (Severity 5, Likelihood 4, Risk 20 CRITICAL) — Isolate and LOTO main supply, test with approved voltage detector, wear insulated PPE Category 4... PRO tool — full document continues...
Every tradesperson knows this moment. Work stops while you dig through a standard you don’t have on you.
📚
The standard is at the office
AS/NZS 3000 is 700 pages. You need clause 3.6.2. It’s not in your head and not on your phone.
✓ Legis-Link gives you the exact clause in 3 seconds
🔑
Wrong cable = rework
Ordering 2.5mm² when the job needed 4mm² costs more than the cable. It costs a day’s work.
✓ Material compliance check before you order
📋
RAMS takes 3 hours
A Risk Assessment and Method Statement used to mean clearing your afternoon. Not anymore.
✓ Full RAMS document generated in 60 seconds
💡
Inspectors ask questions you weren’t expecting
The hold point you missed. The certificate you didn’t know was mandatory. The form number you never heard of.
✓ Every hold point, every certificate, every form number
What it does
8 tools. Every trade. Every region.
From a quick code lookup to a full RAMS document — all from your phone on site.
FREE
Compliance check
Ask whether any installation, material, or practice is compliant. Get the exact standard and clause that answers it. COMPLIANT / NON_COMPLIANT / REQUIRES VERIFICATION.
FREE
Code reference lookup
Need the specific table, clause or section? Get the standard name, edition year, and what that clause actually requires — in plain English.
PRO
Technical calculations
Cable sizing, pipe sizing, voltage drop, HVAC loads. Enter your parameters, get the answer with the calculation shown and the code reference cited.
PRO
Safety checklist
15-item safety checklists with PPE requirements, hazard controls, and the specific regulation that mandates each item. Foreman-ready in under a minute.
PRO
RAMS generator
Full Risk Assessment and Method Statement: Hazard Register with risk ratings, numbered Method Statement, required qualifications. Print-ready, site-file ready.
PRO
Inspection requirements
Every hold point, who signs off, what certificate is issued, which form number, how much notice. Never cover work before a mandatory inspection again.
Coverage
Your jurisdiction. Your standard.
Not a one-size-fits-all approximation — the correct code for where you’re standing.
Free • No signup • Works on any phone • AU • UK • US • CA • EU
Free Construction Compliance Checker for UK & EU Trades
Legis-Link is a free AI-powered construction compliance tool for electricians,
plumbers, HVAC engineers, welders, and site managers in the UK and EU.
Check compliance with Part P, BS 7671, WAHR 2005, CDM 2015, CAR 2012,
and 50+ other UK building regulations — no signup required.
Free features (no account needed)
Compliance check — describe your job, get instant regulatory assessment
Code reference — exact clause lookup across UK and EU regulations
Toolbox talks — 70 topics across 10 trades, daily rotation
Technical calculations — cable sizing, voltage drop, pipe sizing
Safety checklists, material compliance, inspection requirements
Visual compliance — photo upload for site checks
Regulations covered
Part P Building Regulations · BS 7671:2018 (IET Wiring Regulations) ·
Working at Height Regulations 2005 (WAHR 2005) ·
Control of Asbestos Regulations 2012 (CAR 2012) ·
Construction Design and Management Regulations 2015 (CDM 2015) ·
Building Safety Act 2022 · Gas Safety Regulations 1998 ·
Water Supply (Water Fittings) Regulations 1999 ·
F-Gas Regulations 2015 · Fire Safety Act 2021