Live — 645 compliance checks today

The code reference is in your pocket.
Not in the truck.

Ask any compliance question in plain English. Get the exact standard, clause, and table reference in seconds. Free on mobile — no app, no account.

Try it free → Get Pro — $199/yr

Free tier: 50 queries/day • No signup • Works on any phone

legis-link-mcp-production-3e9b.up.railway.app/app
U
Wire size for 45A load, 30 metres, 240V single phase NSW
LL
10mm² copper conductor required. Working: 45A continuous load at 30m on 240V single phase gives 1.97% voltage drop — within the 3% sub-circuit limit. Installation method (clipped direct, in conduit) may require derating to 16mm² if bundled.
● COMPLIANT
Ref: AS/NZS 3008.1.1:2017 Table C1, AS/NZS 3000:2018 Clause 3.6.2
U
Generate a RAMS for electrical switchboard installation
LL
RAMS — Electrical Switchboard Installation NSW
Hazard Register: Electric shock (Severity 5, Likelihood 4, Risk 20 CRITICAL) — Isolate and LOTO main supply, test with approved voltage detector, wear insulated PPE Category 4...
PRO tool — full document continues...
● COMPLIANT
Ref: WHS Act 2011 (NSW), AS/NZS 3000:2018, Electrical Safety Code

Covers every trade
Electrical
Plumbing
HVAC
Gas fitting
Welding
Solar / Battery
Fire protection
Carpentry
Concrete
Roofing
Electrical
Plumbing
HVAC
Gas fitting
Welding
Solar / Battery
Fire protection
Carpentry
Concrete
Roofing

The problem

You’re on site. The answer is 400km away.

Every tradesperson knows this moment. Work stops while you dig through a standard you don’t have on you.

📚

The standard is at the office

AS/NZS 3000 is 700 pages. You need clause 3.6.2. It’s not in your head and not on your phone.

✓ Legis-Link gives you the exact clause in 3 seconds
🔑

Wrong cable = rework

Ordering 2.5mm² when the job needed 4mm² costs more than the cable. It costs a day’s work.

✓ Material compliance check before you order
📋

RAMS takes 3 hours

A Risk Assessment and Method Statement used to mean clearing your afternoon. Not anymore.

✓ Full RAMS document generated in 60 seconds
💡

Inspectors ask questions you weren’t expecting

The hold point you missed. The certificate you didn’t know was mandatory. The form number you never heard of.

✓ Every hold point, every certificate, every form number

What it does

8 tools. Every trade. Every region.

From a quick code lookup to a full RAMS document — all from your phone on site.

FREE

Compliance check

Ask whether any installation, material, or practice is compliant. Get the exact standard and clause that answers it. COMPLIANT / NON_COMPLIANT / REQUIRES VERIFICATION.

FREE

Code reference lookup

Need the specific table, clause or section? Get the standard name, edition year, and what that clause actually requires — in plain English.

PRO

Technical calculations

Cable sizing, pipe sizing, voltage drop, HVAC loads. Enter your parameters, get the answer with the calculation shown and the code reference cited.

PRO

Safety checklist

15-item safety checklists with PPE requirements, hazard controls, and the specific regulation that mandates each item. Foreman-ready in under a minute.

PRO

RAMS generator

Full Risk Assessment and Method Statement: Hazard Register with risk ratings, numbered Method Statement, required qualifications. Print-ready, site-file ready.

PRO

Inspection requirements

Every hold point, who signs off, what certificate is issued, which form number, how much notice. Never cover work before a mandatory inspection again.


Coverage

Your jurisdiction. Your standard.

Not a one-size-fits-all approximation — the correct code for where you’re standing.

🇦🇺

Australia

AS/NZS 3000, AS/NZS 3008
NCC 2022, WHS Acts
NSW, VIC, QLD, WA, SA

🇬🇧

United Kingdom

BS 7671:2018, CDM 2015
HSE guidance, Gas Safe
England, Scotland, Wales

🇺🇸

United States

NEC NFPA 70, IBC
OSHA 29 CFR 1926
TX, CA, FL, NY, IL

🇨🇦

Canada

CEC CSA C22.1, NBC
NPC, Provincial codes
ON, BC, AB, QC

🇪🇺

European Union

EN standards
IEC 60364, EN 806
DE, FR, NL, IE, ES


Pricing

Start free. Upgrade when you need more.

No credit card for free tier. Pro unlocks all 8 tools and 1,000 queries/day.

Free
$0 forever
No account needed. Open your browser and go.
  • 50 queries/day
  • Compliance check
  • Code reference lookup
  • List supported regions
  • Technical calculations
  • Safety checklists
  • RAMS generator
  • Inspection requirements
Try free →

Open it on your phone.
Right now.

No download. No account. Takes 5 seconds. Ask your first compliance question for free.

Free • No signup • Works on any phone • AU • UK • US • CA • EU

Free Construction Compliance Checker for UK & EU Trades

Legis-Link is a free AI-powered construction compliance tool for electricians, plumbers, HVAC engineers, welders, and site managers in the UK and EU. Check compliance with Part P, BS 7671, WAHR 2005, CDM 2015, CAR 2012, and 50+ other UK building regulations — no signup required.

Free features (no account needed)

Pro features (£199/year)

Regulations covered

Part P Building Regulations · BS 7671:2018 (IET Wiring Regulations) · Working at Height Regulations 2005 (WAHR 2005) · Control of Asbestos Regulations 2012 (CAR 2012) · Construction Design and Management Regulations 2015 (CDM 2015) · Building Safety Act 2022 · Gas Safety Regulations 1998 · Water Supply (Water Fittings) Regulations 1999 · F-Gas Regulations 2015 · Fire Safety Act 2021

Open free compliance checker →